OB-1 is HyPrSpace's orbital micro-launcher under development in France, using a turbopump-free hybrid rocket engine to deliver up to 235 kg of payload to low Earth orbit.

Key figurescomparable across the catalogue

Payload capacity
235 kg

Normalised to common units so this product can be compared with others in its category. The supplier's own wording is below.

As published by the supplier

Height
~16 m
Propulsion
Hybrid rocket engine ('Terminator'): solid HDPE fuel grain + liquid oxidizer, helium-pressurized, turbopump-free
Engine thrust (demonstrator)
~100 kN
Payload to LEO
Up to 235-250 kg
Target orbit
LEO, up to ~400 km altitude
Key customer/contract
CNES R2D2 contract (~€50M, 5 launches up to 235 kg to LEO)
Flight heritage/status (mid-2026)
No orbital flight yet. PDR completed Nov 2024; Terminator engine hot-fire test campaigns completed July and Dec 2024; suborbital Baguette One demonstrator flight planned H1 2026; first orbital OB-1 flight targeted late 2027

About

Orbital Baguette One (OB-1) is an orbital micro-launcher being developed by the French startup HyPrSpace (Bordeaux, founded 2019). The vehicle is built around HyPrSpace’s proprietary ‘Terminator’ hybrid rocket engine, which combines a solid HDPE fuel grain with a liquid oxidizer and a helium pressurization system, eliminating the need for a turbopump. OB-1 stands roughly 16 metres tall and is designed to place payloads of up to 235-250 kg into low Earth orbit, targeting the responsive/small-satellite launch market and France’s strategic autonomous access to space. Development has been supported by CNES’s R2D2 contract (~€50 million) and a €35M PADA1 consortium project. As of mid-2026, OB-1 has not flown: HyPrSpace completed a Preliminary Design Review in November 2024 and full-scale ‘Terminator’ engine hot-fire test campaigns in July and December 2024. The company’s near-term milestone is a suborbital demonstrator flight of the related ‘Baguette One’ vehicle (targeted for the first half of 2026), followed by a ‘Ground Toaster’ full flight-ready engine test (Q4 2026) ahead of OB-1’s planned maiden orbital flight, targeted for late 2027.

Documentation

No public datasheet yet — request the datasheet / ICD from the supplier.