HARDWARE / PRODUCTUpdated 24 Jul 2026

Modified Low Power Stationary Plasma Thruster with 50 mm Diameter of the Accelerating Channel

Glavkosmos
Modified Low Power Stationary Plasma Thruster with 50 mm Diameter of the Accelerating Channel

A modified low-power stationary plasma thruster with a 50 mm accelerating channel, designed for spacecraft station keeping and flight-qualified on OneWeb satellites.

Key figurescomparable across the catalogue

Mass
1.32 kg
Power
220 W
Thrust
0.015 N
Specific impulse
930 s
Total impulse
0.27 N·s
Design life
0.57 years
Lead time
10 months

Normalised to common units so this product can be compared with others in its category. The supplier's own wording is below.

As published by the supplier

Purpose
Spacecraft (S/C) station keeping.
Year of release
2016
Design life
5000 hours 6000 cycles years
Lead time
10 months
Flight qualification of the product
Yes
Brief history of flight qualification
As part of OneWeb S/C.
Possibility to adapt the product to customer requirements
Yes
Discharge power
220/300 W
Discharge voltage
180/300 V
Discharge current
1.2/1.0 A
Thrust
14.8/18.0 mN
Specific impulse
930/1300 s
Efficiency
35%
Specific power
167/227 W/kg
Power-to-thrust ratio
14.9/16.7 W/mN
Total impulse
> 0.27/0.4 MN∙s
Mass
1.32 kg

About

This modified low-power stationary plasma thruster features a 50 mm diameter accelerating channel and is specifically designed for spacecraft station keeping. It utilizes xenon as a propellant and consists of anode and cathode units. The thruster employs a classical magnetic system with magnetic screens and three external magnetic coils. The outside diameter of the accelerating channel is 50 mm, with a mean diameter of 40.5 mm. It incorporates a low flow rate cathode and is constructed with new structural materials and components. The product was released in 2016 and has a guaranteed service life of 5000 hours and 6000 cycles. It is flight-qualified, having been used as part of OneWeb spacecraft. The manufacturer offers the possibility to adapt the product to customer requirements. Estimated production/delivery time is 10 months, not including material procurement (4 months) and parts/components procurement (6 months).

Documentation

No public datasheet yet — request the datasheet / ICD from the supplier.

Source: trade.glavkosmos.com ↗

The rest of the range from Glavkosmos

All 200 products →