Space Hardware Marketplace

541 flight-proven satellite platforms, components and ground equipment from verified manufacturers worldwide.

541 products Reset
Ground Segment

Transportation Vehicle

Glavkosmos
Mass 28,100 kg · Power 41,000 W

Contains:Temperature control module, ventilation module, control module and power supply module of 2 modern diesel power generators.

Ground Segment

Pumping Station

Glavkosmos
Power 35,500 W

Explosion-proof hydraulic pumping station (50–400 kgf/cm², up to 35.5 kW, +5 to +35 °C, oil MGE-10A) for closed-loop…

Ground Segment

Signaling Device

Glavkosmos
Mass 44 kg · Power 250 W

The FAM signaling device includes the following blocks and nodes: optical block, power supply, control unit, PMT block,…

Ground Segment

Liquid Oxygen Supply System

Glavkosmos
  • PurposeLiquid oxygen intake, storage, and delivery to LV tanks
  • Development start2002
  • Guaranteed service life, years2

Launch facility LOX intake/storage/delivery system (672 t storage, -183 °C, 191 t LV delivery) for LV oxidizer supply.

Ground Segment

LV Thermal Conditioning System [high pressure]

Glavkosmos
  • PurposeHigh-pressure compressed air/nitrogen intake from storage and delivery to LV compartments
  • Flight qualificationNo
  • CustomizationCan be adapted to customer requirements

High-pressure (38–40 MPa) compressed air/nitrogen intake and delivery system for LV thermal conditioning. Components: pneumoboards, cooler, heater, supply…

Ground Segment

LV Thermal Conditioning System [low pressure]

Glavkosmos
  • PurposeAir preparation (cleaning, drying, heating) and delivery to LV compartments during prelaunch and launch
  • Development start2005
  • Estimated production/delivery time18 months (new) / 6 months (refurbished)

Stationary LV compartment thermal conditioning system (air cleaning/drying/heating) for Soyuz at Kourou, GSC launch complex. Vapor compression refrigerating…

Ground Segment

Mobile Service Tower

Glavkosmos
  • Automatic coupling of electric and pneumatic linesyes
  • Pest protectionyes

MST is a mobile weather-proof and self-propelled structure, which can travel inside the launch facility on two parallel…

Ground Segment

Integration Stand 2

Glavkosmos
Mass 10,200 kg

Spacecraft integration platform (10200 kg, 4230×16035×10505 mm) with 3-level service platforms for assembly/disassembly and solar panel deployment testing.

Ground Segment

Kerosene Cooling System

Glavkosmos
  • PurposeKerosene cooling for LV propellant conditioning units
  • Development start2002
  • Guaranteed service life, years2

Launch facility kerosene pre-cooling system (85 t storage, -196 °C coolant, -3 °C kerosene min temperature) for LV…

Ground Segment

Kerosene Supply System 1

Glavkosmos
  • PurposeLV first and second stage tank filling/dumping with kerosene
  • Release dateMay 2008
  • Guaranteed service life, years2

Launch facility pipeline system for LV first/second stage tank kerosene filling/dumping. Launch-facility-integrated. Customizable.

Ground Segment

Kerosene Supply System

Glavkosmos
  • PurposeLV third stage tank kerosene supply and discharge
  • Release dateSeptember 2008
  • Guaranteed service life, years2

Launch facility pipeline system for LV third stage tank kerosene supply/discharge. Spans launch facility and MST. Customizable.